CSR programme

In 2013/14, discussions on CSR goals led to the identification of specific area focal points based on the EVN materiality matrix and to the subsequent definition of Group-wide CSR targets. These targets are classified by area of activity in the following CSR programme and highlighted in grey. The programme of CSR measures was developed in an iterative process according to the individual areas of activity. In collaboration with all departments, it is expanded regularly to include new measures in all areas of the EVN Group.

CSR measures by area of activity

Area of activity: Supply security

Increase the Group-wide coverage ratio to 30% of the electricity sales

  • Status: 22.7%

Sustainable, economical expansion of supply infrastructure

  • Status: Preparation of a joint issue/criteria catalogue

EVN defined the following department targets and implemented the following measures to meet these corporate goals:

>Enlarge table
Department target Measures Milestone DeadlineStatus as of
30 September 2014
Increase the Group coverage ratio
to 30% of electricity sales
Realisation of power plant projects in Austria
and other countries. Capacity expansion
will focus primarily on renewable energies,
including windpower and hydropower plants
in Austria and large hydropower projects in
other countries.
On-goingOn-going measure
Accreditation of EVN Wasser
as a certified ÖVGW water
supplier
Accreditation of EVN Wasser as a certified
ÖVGW water supplier during the next two
years
End of
2013/14
Measure in implementation
EVN Abfall: increase plant availability Step-by-step refitting of boilers with
corrosion-resistant materials (cladding)
By 2015Measure in implementation
Create a shared awareness among
all involved employees for the
sustainable and economical realisation
of network infrastructure
projects; retain current expertise
and make this know-how available
to new employees
Preparation of a subject/criteria catalogue
for the sustainable and economical planning
and construction of pipeline projects
31.03.2014Successfully completed
Kabelplus: reduce modem failure rates Increase in the number of optical feed-in
points in the network
End of
2014/15
Planned
Economic and regional expansion
of supply infrastructure
Three pilot projects: expansion of glass fibre
cables to reach the customer (FTTH)
End of
2013/14
Successfully completed
Steigerung der Sicherheit bei
E-Operations in Bezug auf
Smart Grids
Preparation of the concept
“Safety in the new environment“
End of
2013/14
Successfully completed

Area of activity: Focus on the customer

Increase the number of energy advising discussions

  • Status: Number of energy advising discussions 6,891

EVN defined the following department targets and implemented the following measures to meet these corporate goals:

>Enlarge table
Department
target
MeasuresMilestone
Deadline
Status as of
30 September 2014
Create a greater awareness among
customers for the conscious use of
energy in Macedonia, also via social
media
Workshops, cooperations, education through
energy savings campaigns and social media
On-goingMeasure in implementation
Increase the awareness for energy
efficiency and for the safe handling
of electricity in Macedonia
Energy efficiency clubs and education on the
subject in schools, founding of a joint energy
efficiency platform with the Economics
Ministry
On-goingMeasure in implementation
Further improve the presentability
and understandability of price
policies
New bonus point system to replace FreiTage.
It not only rewards customer behaviour, but
also supports the common goal to use energy
efficiently. “EVN – Energie vernünftig nutzen.“
01.10.2014Measure in implementation
Support for households at risk of
poverty
Special bonus as part of the EVN Bonus World
and training for social organisations
incl. efficiency start-up kit
2014/15Planned
Renewable energies –
services and tariffs
Proposals to customers to generate their own
electricity based on renewable energies
(photovoltaic, photovoltaic with public
participation, small windpower plants, biogas product, etc.)
as well as services to improve energy efficiency
and thereby reduce the use of fossil energy
carriers
Ende
2013/14
Successfully completed
Increase the safe handling of
electricity in Bulgaria
Programme “Energy efficiency in schools” (5th
grade) – education on electricity consumption
in cooperation with the Ministry of Education
and school inspectors in nine regions
On-goingMeasure in implementation

Area of activity: Sustainable increase in shareholder value

Remain pioneer for sustainability in Austria; continued inclusion in sustainability indices and addition of new listings

  • Status: EVN is currently listed in four sustainability indices
    (VÖNIX, FTSE4Good, ECPI, Ethibel)

Long-term integration of sustainability aspects in risk management

  • Status: 8% of risks based on sustainability aspects

EVN defined the following department targets and implemented the following measures to meet these corporate goals:

>Enlarge table
Department
target
MeasuresMilestone DeadlineStatus as of
30 September 2014
Increase awareness for CSR
in internal audit activities
Development of further goals based on the
results of the pilot project
2013/14Measure in implementation: inclusion
of CSR as a potential focal point in the
TeamMate software used by internal
audit. This will ensure that every audit
evaluates the relevance of CSR and also
allow for the inclusion of CSR as an audit
focal point. Standardised instructions
(so-called test labels) in the software will
be used to achieve the intended results.
Measure in implementation: further
development of monitoring and Groupwide
CSR goals, amplification of CSR
strategy based on target discussions.
Establish Group-wide CSR standardsFurther development and standardisation of
CSR goals, organisations and processes
2014/15Measure in implementation: CSR target
discussions with all organisational units
are planned for 2014/15 in 2013/14
based on new materiality matrix.
CSR target discussions with specialist
departments to complete CSR management
2014/15Measure in implementation: CSR target
discussions with all organisational units
are planned for 2014/15 in 2013/14
based on new materiality matrix.
Stakeholderbefragung zur
CSR-Wesentlichkeitsmatrix durchführen
01.05.2014Successfully completed: new materiality
matrix prepared, results presented to
CSR-steering committee
WTE: establish CSR standardsCreate a CSR teamStarted in
July 2013
Measure in implementation
WTE: further develop documentation
and controls for financial reporting
processes
Continuation of risk-oriented
internal control system
On-goingMeasure in implementation
Safe operations (automated monitoring)
of IT core processes in EVN
Concept for process monitoringBeginning
2013/14
Successfully completed
Partial implementation of process monitoring2013/14Successfully completed
Increase Group-wide coverage
ratio to 30% of electricity sales
Realisation of power plant projects in Austria
and other countries – the expansion of
generation capacity should be based primarily
on renewable energies – e.g. windpower and
hydropower in Austria and major
hydropower
projects in other countries.
On-goingOn-going measure
Accreditation of EVN Wasser
as a certified ÖVGW water
supplier
Accreditation of EVN Wasser as a certified
ÖVGW water supplier during the next two
years
End of
2013/14
Measure in implementation
EVN Abfall: increase in availability
of equipment
Step-by-step refitting of boilers with corrosion-
resistant materials (cladding)
By 2015Measure in implementation

Area of activity: Responsible employer

Expansion of internal job market and increase in internal recruiting

  • Status: 80% of management positions were filled internally.

Increased share of women in new hiring (based on the current per cent by position) and higher share of women in management development programmes (based on the current per cent of women in management)

  • Status: Share of women in the company was 21.4% – share of women in new hiring equalled 32.3% in 2013/14; share of women in management was 7% – share of women in personnel development measures equalled 20%

Development and implementation of target group-specific health programmes for all employees

  • Status: 50 % of the employees took part in preventive measures

Continuous reduction in LTIF and accident severity to a very good comparative level for the industry

  • Status: LTIF: 8.5; accident severity: 21.4

EVN defined the following department targets and implemented the following measures to meet these corporate goals:

>Enlarge table
Department
target
MeasuresMilestone
Deadline
Status as of
30 September 2014
EVN Abfall: improved protective
clothing for employees
Changeover of all employees‘ work
clothing to protective clothing.
2015Measure in implementation
Improve employee satisfaction and
identification with the company
Continuation of feedback and
orientation discussions
On-goingIntroduction completed; discussions
are held annually
Support women in technical
professions
Event “My future at EVN: apprenticeship
training at EVN“
Autumn
2013
Successfully completed; event held at
four locations in Autumn 2013
Integrate sustainability aspects in
current training programmes
Discussions with training managers to identify
opportunities for integration of CSR aspects
31.07.2014Successfully completed
Development of documentation for use
in current training programmes
31.03.2015Pilot project; measure in implementation
Promote health awareness among
employees
Further development of health programme01.09.2014Measure in implementation; further
development in 2014/15
Annual lecture on health issuesOn-goingOn-going measure
First aid courses and health check-upsOn-goingOn-going measure
Positioning of EVN Macedonia as an
attractive employer
Scholarships for students at technical
universities, practical training for students
and school children, trainee programme
for university graduates, cooperation with
universities
On-goingMeasure in implementation
Job application training in schoolsPreparation of job application (CV, motivation
letter, etc.) in project groups for vacation jobs
at EVN.
01.12.2014Successfully completed

Area of activity: Environmental protection and resource conservation

EVN defined the following department targets and implemented the following measures to meet these corporate goals:

>Enlarge table
Department
target
MeasuresMilestone
Deadline
Status as of
30 September 2014

EMAS-Ziel
Implement environmental
management systems in EVN
headquarters and the
Korneuburg power plant
By 2016Measure in implementation: certification
of the Korneuburg power plant
successfully completed in March 2014;
preparations completed for certification
of EVN headquarters – start of implementation
in first quarter of 2014/15

EMAS-Ziel
Continuously improve plant indicators
at the district heating plants
operated by EVN Wärme GmbH
Steady improvement in data quality; recording
and control of data; implementation of
valuation models to optimise technical controlling
and resulting improvement in plant
indicators such as effectiveness
Multi-year
goal
Basic system under development;
district heating plants will be connected
to the system for the next five years

EMAS-Ziel
Reduce the CO2 footprint of the
motor vehicle fleet at EVN Wärme
Replacement of 10% of diesel-driven company
vehicles with natural gas-driven vehicles
in 2013 and 5% of diesel-driven company
vehicles with alternative-drive vehicles
2014Measure partly completed
EVN Abfall: reduce emissions
through better incineration
Optimise combustion control systemOn-goingSuccessfully completed
EVN Abfall: recover metal from
incineration residue
Construction of sewage sludge
incineration plants
On-goingMeasure in implementation
WTE: energetic utilisation of sewage
sludge implementation
Construction of sewage sludge
incineration plants
On-goingMeasure in implementation
Protection of the imperial eagle in
Bulgaria
Project Life+: minimise risks and dangers from
power lines for the imperial eagle
2018Measure in implementation: cabling of
approx. 60 km of overhead power lines;
protective insulation for 2,740 masts;
population monitoring. Project
website: http://www.lifeforsafegrid.bg
Create increased awareness among
employees in Bulgaria for careful
use of resources
Programme to recycle wasteOn-goingMeasure in implementation: in 2013/14
recycling of 1,083 tonnes of waste,
including 29 tonnes of paper
Bird protection in BulgariaInsulation of dangerous masts and power
lines to support projects by the Bulgarian bird
protection association (BDZP, birdlife)
2018Measure in implementation: installation
of an additional 526 nest platforms and
289 protective insulations in 2013/14
Bird protection in AustriaCabling and labelling of overhead power lines
to protect the great bustard in Lower Austria
as part of the LIFE+ project
2015Measure in implementation
Monitor overflow areas:
research/monitor / forecast development
of blue-green algae
Development of a measurement system2014Measure in implementation: Versuchssonde
in Probebetrieb am Stausee
Ottenstein
Kabelplus: recycling of used modemsImplementation of necessary processes,
development of testing routine
2013/14Successfully completed
Paper-free officeElectronic transmission of orders2015Measure in implementation
Reduction of 5% per year in electricity
consumption by IT
End of
2014/15
Implementation in planning
Use of low-pollutant IT componentsIntroduce mandatory environmental compatibility
certificates for IT procurement
End of
2012/13
Successfully completed
Reduce flood of emailsProject “Intranet 2.0“, implementation of
“Personal Excellence Programme (PEP)“
On-goingMeasure in implementation: PEP implemented
at EVN Austria; implementation
in South Eastern Europe planned

Area of activity: Sustainable energy generation and climate protection

Expansion to 300 MW windpower over the medium term

  • Status: installed windpower in MW as of 30.09.2014: 213 MW

Long-term 50% generation from renewable energies

  • Status: generated energy from renewable sources in 2013/14: 42.5 %

EVN defined the following department targets and implemented the following measures to meet these corporate goals:

>Enlarge table
Department
target
Measures Milestone
Deadline
Status as of
30 September 2014
Reduce NOX emissions at the
Dürnrohr power plant by an average
of 25% per year below the legal
threshold starting in 2010
Voluntary agreement for NOX: this goal will
remain intact over the long term, irrespective
of the age of equipment, additional requirements
etc., due to:
- Catalyser washing to improve filtration
efficiency
- Purchase of types of coal with low nitrogen
content
- Primary measures, e.g. the optimisation of
combustion.
On-going seit
2010
Measure in implementation
Research and development to better
utilise the energy content of the
fuels used, to create innovative
storage solutions and to reduce CO2emissions
Bioplastics made of algae, heat storage,
CO2 and sunlight
2015/16 Measure in implementation
EVN Abfall: improve plant efficiency Process optimisation On-going Measure in implementation
Raise awareness for climate
protection
Two events each year to increase awareness
in agreement with climate protection (area of
activity) (depending on which issues are more
important)
On-going Measure in implementation
Increase windpower capacity to
300 MW
2017/18 Measure in implementation
Construction of windpark in Prottes-Ollersdorf
(36.6 MW)
Frühjahr
2015
Measure in implementation
50% of electricity generation from
renewable sources
Further expansion of windpower, hydropower
and photovoltaic generation plants
2020 Measure in implementatio; Current
status: 42.5%
Increase efficiency Optimisation of start-up process for Korneuburg
power plant; reduction of emissions and
natural gas consumption at Dürnrohr power
plant through optimisation of district heating
transmission
On-going Measure in implementation

EMAS-Ziel
Increase efficiency of the EVN steam
turbine at the Dürnrohr power plant
Installation of additional system to
evacuate steam seepage
On-going Measure in implementation

EMAS-Ziel
Cut energy consumption by 50%
in the flue gas desulphurisation
aggregate (REA) at the Theiss power
plant
Optimisation of compressed air systems On-going Measure in implementation
Renewable energies – service products and tariffs
Optima hydropower as an electricity standard
product and Optima biogas as a gas standard
product for EVN: new customers automatically
receive renewable energy offers for these products
unless other alternatives are requested
Starting on
01.10.2014
Measure in implementation:
after introduction, on-going process
Renewable energies – service
products and tariffs
New photovoltaic feed-in compensation:
1:1 payment equal to energy price paid for
electricity purchases from EVN
Starting in
May 2014
Successfully completed: on-going process
EMAS-Ziel Continuously improve plant indicators
at the district heating plants
operated by EVN Wärme
Steady improvement in data quality; recording
and control of data; implementation of valuation
models to optimise technical controlling
and resulting improvement in plant indicators
such as effectiveness
Measure in implementation: basic system
under development; district heating
plants will be connected to the system
over the next five years

In addition to the six major areas of activity, EVN also worked on department targets and numerous measures in other important areas of activity during the reporting year:

Area of activity: Prevention of corruption

>Enlarge table
Department
target
Measures Milestone
Deadline
Status per
30. September 2014
Comply with national, international
and corporate (Code of Conduct)
rules to prevent:
- Consequences under criminal law
for the company and employees
- Consequences under civil law for
the company and employees
- Risk of blackmail
Preparation and communication of
Code of Conduct
On-going Preparation completed,
communication on-going measure
Training for management and employees On-going Measure in implementation
On-going advising On-going Measure in implementation
Raise employee awareness and
active contribution to observance
of human rights and prevention of
corruption
Design and implementation of a comprehensive
compliance management system for the
EVN Group; communication tools for training
and informing employees will be developed
and implemented
01.05.2014 Successfully completed at all EVN
locations with the exception of
Macedonia and Russia
Develop a corporate governance
training concept for EVN managing
directors by the end of 2012
Development of a modular concept for
training managing directors
By end of
2012
Successfully completed
Special training for managers on
corporate governance and the
legal framework for company
management
Development of a concept; preparation of
comprehensive training materials; inclusion
of external lecturers; organisation of test
training courses; individualisation of training
offering
By end of
2014
Concept development and test courses
completed in 2013/14; Group-wide rollout
in 2014/15
Standardise Group-wide corporate
governance to support the management
of investments in line with the
respective risks
Preparation of sample documents and instructions
for action, clustering of investments
for classification according to corporate
governance risks; development of control
mechanisms for the various risk levels
By end of
2015
Standardisation in implementation; focus
for 2014/15 on clustering of investments
Identify inappropriate behaviour Introduction of whistle-blowing programmes
throughout the Group
01.09.2014 Implemented in Austria; evaluation
started in other countries; all reports in
all regions are handled according to the
whistle-blowing procedures

Area of activity: Stakeholder dialogue

>Enlarge table
Department
target
Measures Milestone
Deadline
Status per
30. September 2014
Continue dialogue with all
stakeholders
Definition and implementation of
defined stakeholder concept
On-going 2014 stakeholder survey completed;
next step: development of an annual
stakeholder dialogue
Actively communicate and cooperate
with other companies; organisation
of and participation in CSR events
Exchange at external CSR events,
participation in UN Global Compact
(UNGC) steering committee
On-going Participation in UNGC working groups,
UNGC visit from Taiwan, contribution
to Austrian CSR dialogue, respACT-
membership meeting

Area of activity: One EVN

>Enlarge table
Department
target
MeasuresMilestone
Deadline
Status as of
30. September 2014
Internal brandingIntroduction of key values to increase
employees‘ motivation and establish a
shared corporate culture
2014/15Implementation in planning:
Workshops and internal communication
measures planned
Establish Group-wide
CSR standards
Development of CSR organisation
(organisation and processes) similar to the
structure in Austria; communication with
CSR network officers in Bulgaria, Macedonia,
Croatia and Germany
On-goingImplementation in planning:
Workshops and internal communication
measures planned
Introduce key values in
Macedonia and increase mutual
cultural understanding
Human Resources Day for integration
in South Eastern Europe (2014),
project to implement key values
2015/16Measure in implementation:
project manager appointed
Integration, modernisationInternal events and know-how transfer across
divisions and borders
On-goingMeasure in implementation

Area of activity: Human rights

>Enlarge table
Department
target
MeasuresMilestone
Deadline
Status as of
30 September 2014
Improve understanding of human
rights requirements
Participation in UNGC events, analysis of
guidelines on human rights followed by
internal know-how transfer
2014/15Survey of status, analysis with CSR
officers, development of a declaration
of principle on human rights

Area of activity: Supply chain responsibility

>Enlarge table
Department
target
MeasuresMilestone
Deadline
Status as of
30 September 2014
Anchor integrity clause (incl. social,
ecological and corruptions aspects)
with all contractors
Preparation and on-going adjustment of
integrity clause (incl. social,
ecological and
corruption aspects)
2012Successfully completed; revision in 2013
with minor adjustments to
questionnaire
for contractors
Integrity clause as integral part of all
orders/framework agreements
2012Successfully completed: included in all
orders/contracts in 2013/14
Preparation of an audit questionnaire to
evaluate compliance with the integrity clause
2013Successfully completed: document was
prepared; revision will cover entire Group
Review of contractors for compliance
with the integrity clause
2014(Bulgaria, Macedonia, Croatia)
Measure in implementation:
first audits completed
Follow-up training for failure to
comply with key parts of the
integrity clause
On-goingMeasure in implementation: in connection
with the review of compliance with
the integrity clause

Area of activity: Social commitment

>Enlarge table
Department
target
MeasuresMilestone
Deadline
Status as of
30 September 2014
Organise tennis weekend for children
“Master your Energy! Turn it
into health, knowledge and skills.“
Tennis weekend held for children between
five and ten years of age, where EVN not only
guarantees funding for the awards, but also
for training over the entire weekend
On-going520 children have participated since the
programme was started in 2010
Organise social activities in supply
areas of Bulgaria
Christmas giftsOn-goingMeasure in implementation: renovation
of OP area in children’s surgical ward at
St. George hospital, Plovdiv in 2013/14
WTE: organise social sponsoring
activities focused on projects to help
children and young people
Annual donation of EUR 10,000
from WTE Social Fund
On-goingMeasure in implementation
Increase interest in technical
professions, improve quality of
training, recruitment
Cooperation with schools, colleges and
universities in Bulgaria
On-goingMeasure in implementation: approx.
200 students from technical universities,
colleges and secondary schools took
part in the following measures during
2013/14: plant tours, advising for doctoral
candidates, career days,
sponsoring, lectures by management
Increase identification of employees
with the company
„EVN4NÖ/EVN for Lower Austria – Corporate
Volunteering Project for EVN employees who
want to support a social project they have
chosen themselves. Working time and financial
support from EVN.
23.10.2014Successfully completed
Introduction of a social tariff for
charitable organisations
Introduction of a social tariff for families
at risk of poverty (organisation with Socius
association)
2013/14Successfully completed
Social project “aktiv +”Free Internet in new Internet cafe operated by
Socius association, workshop days
2013/14Successfully completed